For a psychiatric center in Groningen, NPI supplied film for a pond around the building. When the capacity of the clinic was expanded several years ago, the new building created the desire for a pond along the building.
NPI lined the pond walls with 2.0 mm HDPE film. This involved a total of approximately 2,400 m2, delivered and processed under KIWA certification. NPI is KIWA certified for the processing of various films, thus meeting high international safety and quality standards. Delivery under the conditions set by KIWA was a requirement for this project and that is why we were allowed to carry out this project.
Besides supplying and welding the film, NPI also took care of the attachment of the film to the concrete, by applying stainless steel strips over a length of approximately 130 meters.