Through a Russian partner, NPI delivered four water tanks for a newly established greenhouse complex in Western Russia. Our partner specialises as a turnkey greenhouse builder, constructing greenhouses from A to Z. This inclusive approach includes every aspect, including the essential component of water storage.
These 4 16-metre tanks were strategically positioned within the greenhouses, a crucial measure in a region where protection against the elements is paramount. Given the sub-zero winter temperatures in this part of Russia, the installation within the greenhouse provides essential safeguards against freezing conditions. The installation behind glass serves as protection, shielding against snow and frost.
During the initial installation phase, one of our specialists was present on-site, welding the connections into place. NPI’s involvement can extend from the initial design phase through production to installation, offering comprehensive support throughout the entire process if needed.